Wednesday, October 9, 2013

10/9 Update

This Week:
First revision for PCM bracket Mount
CAD work for Reluctor Wheel Mount
Design/CAD work for crankshaft sensor mount
Began design work for throttle body elbow

Next week:
Random Vib analysis for PCM bracket, reluctor wheel mount
Finalize materials for PCM bracket, Reluctor wheel mount
Finish CAD work for crankshaft sensor mount
Begin CAD design for throttle body elbow
Begin drawing for Reluctor wheel mount

Updated October Gantt Chart

October Gantt Chart Revision 1 Changes

Added vibration analysis to be done on Throttle Body, Crankshaft Mount, and Reluctor Wheel Mount.

Note:  Some end dates end sooner than listed on chart (Weekends are not considered work days on Gantt Project)


Reluctor Wheel Mount





Wednesday, October 2, 2013

October Gantt Chart

Rough schedule for the Month of October.  If all goes according to plan, we can begin manufacturing parts by the third week of October.

Wire Harness Stripped Down / Reluctor Wheel Drawing

Over this past weekend, the team met to strip down the wire harness.  This involved removing all the tubing/tape, as well as removing all unnecessary wires that would not be needed for the final wiring.

In addition, the team drew some rough sketch ideas for the reluctor wheel mount sensor design.

Tuesday, October 1, 2013

PCM Bracket drawing



10/2 Update

This week:

  • PCM Bracket Drawing
  • Began Bracket material selection
  • CAD work for Reluctor Wheel Mount
  • Design work for Crankshaft Sensor Mount
  • Gantt chart for October
  • Got together for wiring harness modification
Next week:
  • Obtain material for PCM bracket
  • Finalize PCM bracket drawing
  • Finish Reluctor Wheel mount CAD
  • Begin Crankshaft Sensor CAD work
  • Junkyard run on Saturday
  • Begin Throttle body elbow design work