Wednesday, October 23, 2013

10/23 Update

This Week:

  • Throttle body elbow modeled
  • Flow analysis for throttle body elbow
  • Started drawing for reluctor wheel mount/crank sensor mount
Next week:
  • More flow analysis for throttle body elbow
  • Pick final design for throttle body elbow
  • Model ignition coil brackets
  • Drawings for modeled parts

Wednesday, October 16, 2013

Weekend Junkyard Run



This weekend the group went out for a junkyard run.  We ended up going to three different junkyards looking for cooling fans and an adequate fuse box.  

Tuesday, October 15, 2013

Crank Sensor Mount







New Reluctor Wheel Mount Design



10/16 Update

This Week:

  • Junkyard runs
  • New design for reluctor wheel mount modeled
  • Crank sensor mount modeled
  • Throttle body elbow design started
Next Week:
  • Model throttle body elbow
  • Flow analysis for throttle body elbow
  • Spring design for crank sensor mount
  • Drawings for reluctor wheel mount and crank sensor mount

Wednesday, October 9, 2013

10/9 Update

This Week:
First revision for PCM bracket Mount
CAD work for Reluctor Wheel Mount
Design/CAD work for crankshaft sensor mount
Began design work for throttle body elbow

Next week:
Random Vib analysis for PCM bracket, reluctor wheel mount
Finalize materials for PCM bracket, Reluctor wheel mount
Finish CAD work for crankshaft sensor mount
Begin CAD design for throttle body elbow
Begin drawing for Reluctor wheel mount

Updated October Gantt Chart

October Gantt Chart Revision 1 Changes

Added vibration analysis to be done on Throttle Body, Crankshaft Mount, and Reluctor Wheel Mount.

Note:  Some end dates end sooner than listed on chart (Weekends are not considered work days on Gantt Project)